RIBF-TAC05
RIBF TAC05 was held on 17-19 November 2005 at RIKEN. Followings are presentations
at the RIBF TAC05.
- Overview of the RIBF project
- Acceleration scheme
- Overview and construction status
of the RIBF accelerators
- Status of the superconducting magnets
for the SRC
- Charge-strippers
- 28 GHz superconducting ECR ion source
- New injector linac to the
RRC
- Status and features of Big-RIPS
separator project
- RI Spin Laboratory project
- Large-acceptance multi-particle
spectrometer SAMURAI
- SHARAQ spectrometer
- Universal slow RI-beam facility
(SLOWRI)
- Mass measurement with the Isochronous
rare-RI ring
- Electron scattering from unstable
nuclei with SCRIT
last updated on 16 Jan 2006