RIBF-TAC05

RIBF TAC05 was held on 17-19 November 2005 at RIKEN. Followings are presentations at the RIBF TAC05.

  1. Overview of the RIBF project
  2. Acceleration scheme
  3. Overview and construction status of the RIBF accelerators
  4. Status of the superconducting magnets for the SRC
  5. Charge-strippers
  6. 28 GHz superconducting ECR ion source
  7. New injector linac to the RRC
  8. Status and features of Big-RIPS separator project
  9. RI Spin Laboratory project
  10. Large-acceptance multi-particle spectrometer SAMURAI
  11. SHARAQ spectrometer
  12. Universal slow RI-beam facility (SLOWRI)
  13. Mass measurement with the Isochronous rare-RI ring
  14. Electron scattering from unstable nuclei with SCRIT

last updated on 16 Jan 2006